Hazard and Risk of Highway Maintenance Works: Case Study of PLUS Expressways
The North-South Expressway (NSE) (Lebuhraya Utara-Selatan) is the longest expressway in Malaysia with the total length of about 772 km (482 miles) running from Bukit Kayu Hitam in to Johor Bahru. It is known named after the highway's concessionaire, Projek Lebuhraya Utara Selatan Berhad (North...
الحاوية / القاعدة: | MATEC Web of Conferences |
---|---|
المؤلف الرئيسي: | Ahmad A.C.; Zin I.N.M.; Rosli M.N.; Wahid A.M.A.; Kamar I.F.M. |
التنسيق: | Conference paper |
اللغة: | English |
منشور في: |
EDP Sciences
2016
|
الوصول للمادة أونلاين: | https://www.scopus.com/inward/record.uri?eid=2-s2.0-84983517090&doi=10.1051%2fmatecconf%2f20166600106&partnerID=40&md5=7fba13c1715f9c18d3131e2667e57fde |
مواد مشابهة
-
Risk assessment of piling work for mass rapid transit (MRT) construction project
بواسطة: Ahmad A.C.; Kamar I.F.M.; Wahid A.M.A.; Ismail M.F.N.S.
منشور في: (2019) -
Stormwater as a criterion for green highway
بواسطة: Ahmad A.C.; Husin N.I.; Wahid A.M.A.; Kamaruzzaman S.N.
منشور في: (2017) -
Sustainable Waste Management for Green Highway Initiatives
بواسطة: Husin N.I.; Ahmad A.C.; Wahid A.M.A.; Kamaruzzaman S.N.
منشور في: (2016) -
The Influence of Work Adjustment of Malaysian Expatriate Executives in Malaysian Construction Companies Overseas
بواسطة: Zainol H.; Wahid A.M.A.; Ahmad A.C.; Tharim A.H.A.; Ismail N.
منشور في: (2014) -
Overall assessment on flexible pavement maintenance activities along North South Expressway Northern Region: From Alor Setar KM51.40 to Sungai Petani KM 107.90
بواسطة: Albar A.; Osman M.H.; Dollah Z.; Musir A.A.; Roslan N.Z.
منشور في: (2018)