Risk assessment of piling work for mass rapid transit (MRT) construction project
This study focuses on the piling works of Mass Rapid Transit (MRT) line 1 construction project along Sungai Buloh Station to Kajang Station in Malaysia, considering that piling work is one of the high risk construction activities. This study utilizes risk assessment tool using Hazard Identification,...
Published in: | Geographia Technica |
---|---|
Main Author: | |
Format: | Article |
Language: | English |
Published: |
Asociatia Geographia Technica
2019
|
Online Access: | https://www.scopus.com/inward/record.uri?eid=2-s2.0-85068451350&doi=10.21163%2fGT_2019.141.37&partnerID=40&md5=63c0efbd6d1679093e62ede5c06bf93f |
id |
2-s2.0-85068451350 |
---|---|
spelling |
2-s2.0-85068451350 Ahmad A.C.; Kamar I.F.M.; Wahid A.M.A.; Ismail M.F.N.S. Risk assessment of piling work for mass rapid transit (MRT) construction project 2019 Geographia Technica 14 10.21163/GT_2019.141.37 https://www.scopus.com/inward/record.uri?eid=2-s2.0-85068451350&doi=10.21163%2fGT_2019.141.37&partnerID=40&md5=63c0efbd6d1679093e62ede5c06bf93f This study focuses on the piling works of Mass Rapid Transit (MRT) line 1 construction project along Sungai Buloh Station to Kajang Station in Malaysia, considering that piling work is one of the high risk construction activities. This study utilizes risk assessment tool using Hazard Identification, Risk Assessment & Risk Control (HIRARC) to create safe construction workplace. The hazard identification is a process of examination work area and task inherent to piling activities. The risk assessment of piling works calculated using likelihood and severity. Based on the hazard identification and risk assessment results, control measures or risk control are taken into action. The risk assessment sheets as the research instrument tool were filled by 30 construction professionals and safety practitioners i.e. safety officers, safety supervisors, site engineers and site supervisors. The results indicated that there were seven hazards that associated with piling works. One of the hazards which caused structure collapse during test pile activity was assessed as the extreme risk. Other six hazards were assessed as high risk. The total 27 risk control measures were resolved in order to eliminate and reduce hazards as well as prevent accident during piling work at the MRT construction project. © 2019, Asociatia Geographia Technica. All rights reserved. Asociatia Geographia Technica 18425135 English Article All Open Access; Gold Open Access |
author |
Ahmad A.C.; Kamar I.F.M.; Wahid A.M.A.; Ismail M.F.N.S. |
spellingShingle |
Ahmad A.C.; Kamar I.F.M.; Wahid A.M.A.; Ismail M.F.N.S. Risk assessment of piling work for mass rapid transit (MRT) construction project |
author_facet |
Ahmad A.C.; Kamar I.F.M.; Wahid A.M.A.; Ismail M.F.N.S. |
author_sort |
Ahmad A.C.; Kamar I.F.M.; Wahid A.M.A.; Ismail M.F.N.S. |
title |
Risk assessment of piling work for mass rapid transit (MRT) construction project |
title_short |
Risk assessment of piling work for mass rapid transit (MRT) construction project |
title_full |
Risk assessment of piling work for mass rapid transit (MRT) construction project |
title_fullStr |
Risk assessment of piling work for mass rapid transit (MRT) construction project |
title_full_unstemmed |
Risk assessment of piling work for mass rapid transit (MRT) construction project |
title_sort |
Risk assessment of piling work for mass rapid transit (MRT) construction project |
publishDate |
2019 |
container_title |
Geographia Technica |
container_volume |
14 |
container_issue |
|
doi_str_mv |
10.21163/GT_2019.141.37 |
url |
https://www.scopus.com/inward/record.uri?eid=2-s2.0-85068451350&doi=10.21163%2fGT_2019.141.37&partnerID=40&md5=63c0efbd6d1679093e62ede5c06bf93f |
description |
This study focuses on the piling works of Mass Rapid Transit (MRT) line 1 construction project along Sungai Buloh Station to Kajang Station in Malaysia, considering that piling work is one of the high risk construction activities. This study utilizes risk assessment tool using Hazard Identification, Risk Assessment & Risk Control (HIRARC) to create safe construction workplace. The hazard identification is a process of examination work area and task inherent to piling activities. The risk assessment of piling works calculated using likelihood and severity. Based on the hazard identification and risk assessment results, control measures or risk control are taken into action. The risk assessment sheets as the research instrument tool were filled by 30 construction professionals and safety practitioners i.e. safety officers, safety supervisors, site engineers and site supervisors. The results indicated that there were seven hazards that associated with piling works. One of the hazards which caused structure collapse during test pile activity was assessed as the extreme risk. Other six hazards were assessed as high risk. The total 27 risk control measures were resolved in order to eliminate and reduce hazards as well as prevent accident during piling work at the MRT construction project. © 2019, Asociatia Geographia Technica. All rights reserved. |
publisher |
Asociatia Geographia Technica |
issn |
18425135 |
language |
English |
format |
Article |
accesstype |
All Open Access; Gold Open Access |
record_format |
scopus |
collection |
Scopus |
_version_ |
1809677906333401088 |