Risk assessment of piling work for mass rapid transit (MRT) construction project

This study focuses on the piling works of Mass Rapid Transit (MRT) line 1 construction project along Sungai Buloh Station to Kajang Station in Malaysia, considering that piling work is one of the high risk construction activities. This study utilizes risk assessment tool using Hazard Identification,...

Full description

Bibliographic Details
Published in:Geographia Technica
Main Author: Ahmad A.C.; Kamar I.F.M.; Wahid A.M.A.; Ismail M.F.N.S.
Format: Article
Language:English
Published: Asociatia Geographia Technica 2019
Online Access:https://www.scopus.com/inward/record.uri?eid=2-s2.0-85068451350&doi=10.21163%2fGT_2019.141.37&partnerID=40&md5=63c0efbd6d1679093e62ede5c06bf93f
id 2-s2.0-85068451350
spelling 2-s2.0-85068451350
Ahmad A.C.; Kamar I.F.M.; Wahid A.M.A.; Ismail M.F.N.S.
Risk assessment of piling work for mass rapid transit (MRT) construction project
2019
Geographia Technica
14

10.21163/GT_2019.141.37
https://www.scopus.com/inward/record.uri?eid=2-s2.0-85068451350&doi=10.21163%2fGT_2019.141.37&partnerID=40&md5=63c0efbd6d1679093e62ede5c06bf93f
This study focuses on the piling works of Mass Rapid Transit (MRT) line 1 construction project along Sungai Buloh Station to Kajang Station in Malaysia, considering that piling work is one of the high risk construction activities. This study utilizes risk assessment tool using Hazard Identification, Risk Assessment & Risk Control (HIRARC) to create safe construction workplace. The hazard identification is a process of examination work area and task inherent to piling activities. The risk assessment of piling works calculated using likelihood and severity. Based on the hazard identification and risk assessment results, control measures or risk control are taken into action. The risk assessment sheets as the research instrument tool were filled by 30 construction professionals and safety practitioners i.e. safety officers, safety supervisors, site engineers and site supervisors. The results indicated that there were seven hazards that associated with piling works. One of the hazards which caused structure collapse during test pile activity was assessed as the extreme risk. Other six hazards were assessed as high risk. The total 27 risk control measures were resolved in order to eliminate and reduce hazards as well as prevent accident during piling work at the MRT construction project. © 2019, Asociatia Geographia Technica. All rights reserved.
Asociatia Geographia Technica
18425135
English
Article
All Open Access; Gold Open Access
author Ahmad A.C.; Kamar I.F.M.; Wahid A.M.A.; Ismail M.F.N.S.
spellingShingle Ahmad A.C.; Kamar I.F.M.; Wahid A.M.A.; Ismail M.F.N.S.
Risk assessment of piling work for mass rapid transit (MRT) construction project
author_facet Ahmad A.C.; Kamar I.F.M.; Wahid A.M.A.; Ismail M.F.N.S.
author_sort Ahmad A.C.; Kamar I.F.M.; Wahid A.M.A.; Ismail M.F.N.S.
title Risk assessment of piling work for mass rapid transit (MRT) construction project
title_short Risk assessment of piling work for mass rapid transit (MRT) construction project
title_full Risk assessment of piling work for mass rapid transit (MRT) construction project
title_fullStr Risk assessment of piling work for mass rapid transit (MRT) construction project
title_full_unstemmed Risk assessment of piling work for mass rapid transit (MRT) construction project
title_sort Risk assessment of piling work for mass rapid transit (MRT) construction project
publishDate 2019
container_title Geographia Technica
container_volume 14
container_issue
doi_str_mv 10.21163/GT_2019.141.37
url https://www.scopus.com/inward/record.uri?eid=2-s2.0-85068451350&doi=10.21163%2fGT_2019.141.37&partnerID=40&md5=63c0efbd6d1679093e62ede5c06bf93f
description This study focuses on the piling works of Mass Rapid Transit (MRT) line 1 construction project along Sungai Buloh Station to Kajang Station in Malaysia, considering that piling work is one of the high risk construction activities. This study utilizes risk assessment tool using Hazard Identification, Risk Assessment & Risk Control (HIRARC) to create safe construction workplace. The hazard identification is a process of examination work area and task inherent to piling activities. The risk assessment of piling works calculated using likelihood and severity. Based on the hazard identification and risk assessment results, control measures or risk control are taken into action. The risk assessment sheets as the research instrument tool were filled by 30 construction professionals and safety practitioners i.e. safety officers, safety supervisors, site engineers and site supervisors. The results indicated that there were seven hazards that associated with piling works. One of the hazards which caused structure collapse during test pile activity was assessed as the extreme risk. Other six hazards were assessed as high risk. The total 27 risk control measures were resolved in order to eliminate and reduce hazards as well as prevent accident during piling work at the MRT construction project. © 2019, Asociatia Geographia Technica. All rights reserved.
publisher Asociatia Geographia Technica
issn 18425135
language English
format Article
accesstype All Open Access; Gold Open Access
record_format scopus
collection Scopus
_version_ 1809677906333401088