توثيق جمعية علم النفس الأمريكية APA (الطبعة السابعة)

R, A. N. Z. W. H. W. O. A. H. (2024). Decision of Cost Estimation for Competitive Pricing of Modular Construction from China Manufacturer Perspective for Malaysian Industrialised Building System (IBS). IOP Conference Series: Earth and Environmental Science, 1432(1), . https://doi.org/10.1088/1755-1315/1432/1/012011

توثيق أسلوب شيكاغو (الطبعة السابعة عشر)

R, Aziz N.D.; Zamani Wan Hamdan W.S.; Omardin A.; Hasan. "Decision of Cost Estimation for Competitive Pricing of Modular Construction from China Manufacturer Perspective for Malaysian Industrialised Building System (IBS)." IOP Conference Series: Earth and Environmental Science 1432, no. 1 (2024). https://doi.org/10.1088/1755-1315/1432/1/012011.

توثيق جمعية اللغة المعاصرة MLA (الطبعة الثامنة)

R, Aziz N.D.; Zamani Wan Hamdan W.S.; Omardin A.; Hasan. "Decision of Cost Estimation for Competitive Pricing of Modular Construction from China Manufacturer Perspective for Malaysian Industrialised Building System (IBS)." IOP Conference Series: Earth and Environmental Science, vol. 1432, no. 1, 2024, https://doi.org/10.1088/1755-1315/1432/1/012011.

تحذير: قد لا تكون هذه الاستشهادات دائما دقيقة بنسبة 100%.