A mixed integer programming model for solving real-time truck-to-door assignment and scheduling problem at cross docking warehouse

This paper address the problem at the inbound phase at the cross docking warehouse. The fundamental issues in cross docking facility is to assign the incoming truck to the door and to coordinate the sequences of the trucks in order to minimize the completion time at the inbound phase. Using the theo...

وصف كامل

التفاصيل البيبلوغرافية
الحاوية / القاعدة:Journal of Industrial and Management Optimization
المؤلف الرئيسي: 2-s2.0-84955284616
التنسيق: مقال
اللغة:English
منشور في: American Institute of Mathematical Sciences 2016
الوصول للمادة أونلاين:https://www.scopus.com/inward/record.uri?eid=2-s2.0-84955284616&doi=10.3934%2fjimo.2016.12.431&partnerID=40&md5=84782cd0ebf366a053517d28967ef826
الوصف
الملخص:This paper address the problem at the inbound phase at the cross docking warehouse. The fundamental issues in cross docking facility is to assign the incoming truck to the door and to coordinate the sequences of the trucks in order to minimize the completion time at the inbound phase. Using the theories and methodologies of assignment and scheduling, paper on hand proposed a mixed integer programming model for solving the truck-to-door assignment and scheduling problem with the objective to minimize the total service time of trucks. Meanwhile, reduce the waiting time of trucks before being served at the designated door. A preliminary computation is conducted to verify the logic of the mathematical model proposed.
تدمد:15475816
DOI:10.3934/jimo.2016.12.431