A mixed integer programming model for solving real-time truck-to-door assignment and scheduling problem at cross docking warehouse

This paper address the problem at the inbound phase at the cross docking warehouse. The fundamental issues in cross docking facility is to assign the incoming truck to the door and to coordinate the sequences of the trucks in order to minimize the completion time at the inbound phase. Using the theo...

全面介紹

書目詳細資料
發表在:Journal of Industrial and Management Optimization
主要作者: 2-s2.0-84955284616
格式: Article
語言:English
出版: American Institute of Mathematical Sciences 2016
在線閱讀:https://www.scopus.com/inward/record.uri?eid=2-s2.0-84955284616&doi=10.3934%2fjimo.2016.12.431&partnerID=40&md5=84782cd0ebf366a053517d28967ef826
實物特徵
總結:This paper address the problem at the inbound phase at the cross docking warehouse. The fundamental issues in cross docking facility is to assign the incoming truck to the door and to coordinate the sequences of the trucks in order to minimize the completion time at the inbound phase. Using the theories and methodologies of assignment and scheduling, paper on hand proposed a mixed integer programming model for solving the truck-to-door assignment and scheduling problem with the objective to minimize the total service time of trucks. Meanwhile, reduce the waiting time of trucks before being served at the designated door. A preliminary computation is conducted to verify the logic of the mathematical model proposed.
ISSN:15475816
DOI:10.3934/jimo.2016.12.431